Keystone Oaks School District

keystone-oaks-school-district.jpg

Year Completed

2015

Value of Contract

$680,000

Project

Keystone Oaks School District Energy Efficiency Project Phase 1


Huckestein performed extensive repairs to existing HVAC systems to extend useful life until the equipment could be replaced in a cost efficient time frame.

Within Keystone Oaks School District, Huckestein was tasked with designing, engineering and installing mechanical Energy Conservation Measures (ECM) as a subcontractor to Constellation Energy.

Huckestein performed extensive repairs to existing Miller Picking AHUs to improve HVAC system performance and extend useful life until the equipment could be replaced in a cost efficient time frame.

To enhance the HVAC system’s energy efficiency, Huckestein also designed and installed a system of control, isolation and thermal expansion valves and variable frequency drives.

In the end, Huckestein helped the school district develop a 5-year capital plan to replace the HVAC equipment on a cost-effective timeline.


OWNER

Keystone Oaks School District
1000 Kelton Avenue
Pittsburgh, PA 15216

CUSTOMER

Schneider Electric
Dave Kramer
(412) 680-5743
david.kramer@schneider-electric.com