Keystone Oaks School District
Case Studies
Year Completed
2015
Value of Contract
$680,000
Project
Keystone Oaks School District Energy Efficiency Project Phase 1
Huckestein performed extensive repairs to existing HVAC systems to extend useful life until the equipment could be replaced in a cost efficient time frame.
Within Keystone Oaks School District, Huckestein was tasked with designing, engineering and installing mechanical Energy Conservation Measures (ECM) as a subcontractor to Constellation Energy. Huckestein performed extensive repairs to existing Miller Picking AHUs to improve HVAC system performance and extend useful life until the equipment could be replaced in a cost efficient time frame. To enhance the HVAC system’s energy efficiency, Huckestein also designed and installed a system of control, isolation and thermal expansion valves and variable frequency drives. In the end, Huckestein helped the school district develop a 5-year capital plan to replace the HVAC equipment on a cost-effective timeline.
Owner
Keystone Oaks School District
1000 Kelton Avenue
Pittsburgh, PA 15216
Customer
Schneider Electric
Dave Kramer
(412) 680-5743